DAS AZMAN ARCHITECTS Sdn Bhd 583437-V
|
|
........................................................ Back
|
Ar. Khushairi Muhammad | Director
Academic QualificationBachelor of Architecture, University of Houston, Texas, USA
Professional MembershipCorporate Member (APAM) Pertubuhan Akitek Malaysia (Malaysian Institute of Architects)
Professional Architect Lembaga Arkitek Malaysia (Board of Architects Malaysia)
Professional Experience
Sep 1991 to Jan 1992Assistant Architect Kumpulan Perunding, Kuala Terengganu
Assisting Project Architects in Contract Documentation
Jan 1992 to Nov 1992Graduate Architect Hijjas Kasturi Associates, Kuala Lumpur
Job responsibilities include Design Presentation, Documentation for Tender,Detailing and liaison with various Consultants in preparation of Tender and Construction Documents
Dec 1992 to Dec 1993Graduate Architect Hijjas Kasturi Associates, Kuching, Sarawak
Job responsibilities include managing AutoCAD System, Preparation of Drawings for Tender and Construction, Local Authority Submission and liaison with various Consultants and Contractors on projects under construction
Dec 1993 to Jun 1994Graduate Architect Hijjas Kasturi Associates, Kuala Lumpur
Jul 1994 to Jul 1996Architect Samsung-Kukdong-Jasatera JV
A Main Contractor for Base Building Package of the 88 Storey PETRONAS Tower 2 and Skybridge Project. The Package include Concrete and Steel Structural Work, Curtain Wall, Finishes to main washrooms, Drywalls, Blockwalls, Staircase, Lift and Completion of Skybridge.
Attached with Architectural Design Department and job resposibilities include design coordination for Architectural, Structural and Mechanical/Electrical elements and liaison with Consultants and Subcontractors towards preparation of final Setting Out Drawings, Shop Drawings and Detailed Construction Drawings.
Aug 1994 to Oct 1998Architectural Design Coordinator Entrecanales-Ekovest Sdn Bhd
A Main Contractor for a Fit Out Package of the PETRONAS Twin Towers. Job responsibilities include reviewing and preparing Shop Drawings, Material Samples, Mock-Up and Product Technical Data from various Subcontractors to ensure complying with Project Specifications and Design Intent.
Attending weekly coordination meetings with Consultant Architects and Project Managers.
Nov 1998 to Jan 1999Architect Design Context Architects
I was responsible for the Common Banking Foyer Package at Concourse Level of the PETRONAS Twin Towers. (Production Drawings and Site Administration)
Feb 1999 to Nov 2006Project Architect Das Azman Architects Sdn Bhd
Responsibilities include managing Production Office & responsible for the Design & Implementation of the following Projects
Nov 2006 to Feb 2009Senior Architect Hamiltons International Pte Ltd
Mar 2009 to presentDirector Das Azman Architects Sdn Bhd
Copyright 2000-2009, Das Azman Architects Sdn Bhd. All Rights Reserved ........................................................................................................................................................................................................................................................................ |
|